While waiting for some models showing the effect of the rebuild of the floats, the material to do it, and maybe getting hold of the money needed to buy Ian's banana foils, the floats was put in storage to give room for the main hull.
This was moved inside on the special built wagon by the help from some good friends.
This was in time as the hull was getting gradually filled by rain water because of a few leaks, and the temperature fell well below freezing just after the hull was safe inside on November 27th.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment