I am upgrading my existing workshop and now in the process of moving everything out in order to prepare it for 3 or 4 m³ of fiber reinforced concrete. The purpose is to elevate the floor to avoid flooding and at the same time make an even surface, easier to keep clean.
I have been able to add more fairing compound at one occasion during the last month:
The floats, the strongback etc in temporarily storage:
The workshop now being emptied. The water being clearly visible althoughthe level this day is considerably lower than what have been the case onseveral occasions lately:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment