Three more panels fitted today. Cut outs and fillings for the bilge pump on the front port panel. This is quite time consuming work, but I think it should be possible to start fitting the second floor layer tomorrow. I have considered painting the inside of the under seat compartments before fitting the tops, but if I'm able to tape in there I will be able to paint as well. Just a fast fairing before closing off I guess.
Aft view
And the area for the flush mounted bilge pump.
Subscribe to:
Post Comments (Atom)
2 comments:
I thought the same thing ('I can paint it later, so why do it now') - and regretted it.
Do all the painting you can while the compartiments are still open and easily accessible. It will save you a bit of time and a lot of painting in uncomfortable positions.
OK, Menno, I had success following your advice the last time, so will probably do it again:-)
Post a Comment