Progress on workshop building

Last night I added about 11.250 kg or 4,5 m³ of fiber reinforced concrete to my workshop. This means no more flooding, and a much more even and easy to clean surface. The result was not perfect but quite close considering my profession is not within the building branch...

I will spray paint the walls, possibly epoxy paint the floor and also make some improvements on the electrical, ventilating and pneumatic systems when I'm at it, so no main hull building until 2008 I guess...

2 comments:

biol said...

Hi Tor !
When I read "fiber reinforced concrete" I was thinking we would see the first ferro-cement F-22 ;-)

Your project has got a very strong "base". 2008 is just behind the corner, so ... happy building.

Biol

Tor Rabe said...

Hopefully my F22 will be nothing like a ferro-cement vessel ;-)

It is frustrating to spend a lot of time on the workshop instead of the boat, but I realize there will be a much better building environment now. I regret I did not do this before the project started though, (was considering it but discarded it due to the cost and eager to start..) but better late than never I guess.