Tonight the critical (structurally and geometrically) beam bulkheads were positioned and taped inn to the hull. The aft beam bulkhead being placed and preliminary tacked in place with a hot glue gun.
I was lucky to be out and see the sun set around 9:30. The dark season is leaving!
Then the front beam bulkhead was positioned.
Using a small hole drilled from the outside to locate the exact gunwale line.
Then putty fillets and tape.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment