Sunday, May 03, 2009

Beam bulkheads

Tonight the critical (structurally and geometrically) beam bulkheads were positioned and taped inn to the hull. The aft beam bulkhead being placed and preliminary tacked in place with a hot glue gun.

I was lucky to be out and see the sun set around 9:30. The dark season is leaving!


Then the front beam bulkhead was positioned.

Using a small hole drilled from the outside to locate the exact gunwale line.


Then putty fillets and tape.

No comments: